Saturday, 21 November 2026
Newsletter Building Services Today Directory

contract wins

Max Fordham lands two shortlistings for 2027 CIBSE Project of the Year awards

The MEP consultancy's all-electric BEAM theatre in Hertford and the Raymond Chandler Library at Dulwich College are in the running at the CIBSE Building Performance Awards, with winners named on 4 March 2027.

Key figures: 20 Announcement date; 547 BEAM main auditorium; 4 M Awards ceremony
Graphic: Building Services Today

Building services engineer Max Fordham has two projects on the shortlist for the 2027 CIBSE Project of the Year awards: the BEAM arts venue in Hertford and the Raymond Chandler Library at Dulwich College in London.

The practice announced the shortlistings on 20 November 2026. BEAM is entered in the Culture and Entertainment category and the library in the Education category, it said.

The Chartered Institution of Building Services Engineers (CIBSE) Building Performance Awards recognise how buildings perform once in use, covering energy, carbon, occupant comfort and wellbeing, according to Max Fordham. CIBSE describes the awards as the only industry awards that focus on actual, measured performance outcomes.

BEAM, Hertford

BEAM is the conversion of the former Hertford Theatre into what Max Fordham calls a fossil fuel-free venue for live performance and film, designed with architect Bennetts Associates. CIBSE's own shortlist lists the entry as "BEAM Theatre", where it is up against Buro Happold's Sadler's Wells East.

According to Max Fordham's project page, the gas boilers and the gas connection were removed and replaced with an electric-based heating system, and the main theatre was converted from a 400-seat flat-floor room into a 547-seat auditorium. The superstructure makes extensive use of mass timber, the practice said.

Iain Shaw, director, MEP engineering at Max Fordham, said: "This compact venue conceals the wide range of quality entertainment facilities more typically found in the West End and on Broadway."

He added: "To incorporate the services within the tight envelope has been an interesting challenge."

Bennetts Associates, which names East Hertfordshire District Council as the client, said the existing auditorium was expanded and three new cinemas, a studio theatre and dance spaces were added in volumes clad in local brick. The architect lists Integral Engineering as structural engineer and GPF Lewis as main contractor.

East Herts District Council said the venue had undergone a £30m redevelopment over three years when it opened in August 2024, with a 547-seat main auditorium, a second theatre space seating 150, three cinema screens and a dance studio. Max Fordham said the second theatre space opened in 2025.

The project already carries a string of recognitions. The Royal Institute of British Architects put BEAM on its six-project shortlist for the 2026 Stirling Prize, announced on 16 July 2026, noting that the council-led scheme retained the original 1970s theatre structure rather than demolishing it. Bennetts Associates also lists a Brick Award, a UK Theatre Award for Excellence in Sustainability and a Civic Trust Award Highly Commended.

Raymond Chandler Library, Dulwich College

The library, designed with architect alma-nac, appears on CIBSE's list as "Dulwich College, Raymond Chandler Library". Max Fordham said the design took a passive-first approach, using operational energy and embodied carbon analyses to pick the most efficient and cost-effective carbon-reduction measures.

On its project page, the practice said ventilation is provided by a low-energy mechanical ducted system with heat recovery, and heating by air-source heat pumps using low global warming potential refrigerants. The building has achieved BREEAM Excellent certification and won Education Estates Independent School Project of the Year 2025, Max Fordham said.

The library is the first phase of a wider redevelopment of the college's Junior and Lower Schools, which Max Fordham said sits within a net-zero masterplan for the Grade II*-listed campus.

In the Education category it faces Architype's Currie Community High School, Rybka's Woodmill & St-Columbas High School and Tilbury Douglas's St Marys Catholic Voluntary Academy, according to CIBSE's shortlist.

Track record and next steps

Max Fordham said it has won 11 Project of the Year awards at the CIBSE Building Performance Awards since 2017, together with three Building Performance Champion titles.

CIBSE will announce the 2027 winners at a ceremony at the Park Plaza Westminster Bridge in London on 4 March 2027.

Sources

  1. Max Fordham (opens in a new tab) (accessed 2026-11-21)
  2. CIBSE (opens in a new tab) (accessed 2026-11-21)
  3. CIBSE (opens in a new tab) (accessed 2026-11-21)
  4. Max Fordham (opens in a new tab) (accessed 2026-11-21)
  5. Max Fordham (opens in a new tab) (accessed 2026-11-21)
  6. Bennetts Associates (opens in a new tab) (accessed 2026-11-21)
  7. East Herts District Council (opens in a new tab) (accessed 2026-11-21)
  8. Royal Institute of British Architects (opens in a new tab) (accessed 2026-11-21)

This story was researched from the primary sources above and checked against them before publication. Spotted an error? Tell us and we will correct it promptly.

Get stories like this every Friday

The Building Services Today weekly: the week's building services and m&e news in one email, free, and the TC Media Group monthly edition. Unsubscribe in one click.

By subscribing you agree to receive the Building Services Today weekly and the TC Media Group monthly edition. We confirm your address first. Privacy.

More from Building Services Today